Construction Updates
Generally, here’s what to expect during construction:
215, Stephanie St to Pecos Rd
Day: Three lanes open in each direction
Night: Two lanes open in each direction. May be reduced to one lane at times due to safety.
215 Ramps
Consecutive ramps will not be under construction at the same time
Night closures for paving
Surface Streets
Green Valley Pkwy work will be conducted at night
Night closures to build Green Valley Pkwy pedestrian bridge
Construction on St. Rose Pkwy/Pecos Rd or Paseo Verde Pkwy shall not be concurrent with work on Green Valley Pkwy